Skip to content

ICTTEN622 Produce ICT network Architecture designs

ICTTEN622 Produce ICT network Architecture designs

Student name:
Assessor:
Date:

Section 1: Preparation and design

ICT Network Architecture Design 1

Complete this section for ICT network architecture design 1. If they are completing this in their RTO, information about the network and work details will be as per the information discussed at the meeting with their assessor. If they are completing this for their own business, this will be as per the networks they are accessing.

Work details

Outline the details of the work as relevant to the networks to be designed. As a minimum this must include:

·           scope of the work to completed including overall objectives

·           the business’ specifications

·           timelines within which the work must be completed

·           budget allocated

·           procedures to be follotheyd, including security arrangements

·           issues/problems/opportunities that the client has flagged

·           current and future traffic demands.

Here they created a website for the company because there are issues in the software of the company and many problems has been arisen due to the software and lack of best material here they have to update the software and it has the following objective like

The objective of making a website is to grow the growth of business and the organization and its profitability it objective is to create money, sell products via e-commerce websites, affiliate websites, intention to make sell services, and save money of the organization.

The hope is to shorten the project clearly, be approachable, and be fast to load and write the content.

The desired functionality is modest and they will clear and easy to appreciate to a participant, as the quality of the creation and description.

Business specifications mean it is the document which putting together to launch before launching the product to make advertising and do effective marketing planning.

This project must be completed within 8 months.

The total budget should be $3,785.

The procedure must be followed correctly like they have to first analyze the user activities, and produce the prototype design and then evaluate it then executable the prototype, and finally implement it there should be an effective process should be followed by the company the process should be done with follow all the legislation, standards and following all the important procedure are should be done they have to set the expectation of the document. Then they have to use the interface design. And the need and design and principle of the operating system. Which is based on business needs. And analyze them effectively.

Challenges faced by clients

Different expectations, contents which are stalled which is half progress, clients’ unreasonable demands, too much client communications, work overload, and price negotiating.

Current demand of the company to produce large and best quality

Motivate employees and increase the production and profitability of the company.

Legislation, codes, regulations and standards

Provide an example of each that they must adhere to whilst completing theyr work managing network traffic. Explain how each example they provide applies to theyr work.

Legislation, standards, and procedures

There should be legislation once they are emerging the website their requirement be a privacy policy. It is very important to have a privacy policy to gather special data from the worker, they require path the data protection rule. They need to follow with the California consumer privacy act

Standards are the technology that they use to shape the websites. It standards occur in the mechanical long paper which is called report open standards I must be free with together practices and underwrite and not by the allowing rights.

Site access

 

Draft an email that could be sent to a client to organise site access.

 good morning

this email is written due to access the mail dear client they issue all the information about the new software and design please check it carefully and access the site and organize site access in an effective way.

Thank they

Proposed ICT network architecture design

Document theyr proposed network design using a network diagram tool.

Make sure they also document the hardware and software that will be needed.

Attach the diagram of theyr design diagram to theyr Portfolio.

In a technical condition, here is a want for a mobile approachable design, an SSL permit, storage memory, and communication borders, sends,  page loads, functionalities, and behaviors.

It supports to display of the unalike content for apiece time it is observed. The page can alter with the time of the daytime and the user can admission the the webpage.

The graphic arrival matters a lot like the color of the the website, its picture, fonts, and the space and the general visual presence of the the website.

Network architecture design report

Provide a report on the following:

·           Impact of the network design on the business requirements

·           Forecasted traffic and how the network design will be able to cater for this

·           Performance parameters which will be used to assess the network and the likely performance based on the design. Performance parameters must reflect standard industry benchmarks.

·           Costs of hardware and software proposed

·           Overall recommendations for preferred solutions including hardware and software.

The network design which should recognize which customer needs and embody technical and business goals need for the availability, affordability, security, and manageability of the company.

 

Forecasted traffic is the best part of processing the design of the road facilities, which is starting from the investment and study feasibility to developing the document work.

There are many performance parameters that are used to assess the network there are some different common metric that is used to measure the traffic network performance which is including the packet loss indicators, bandwidth, jitter, and throughput.

The cost of hardware software is %5k.

The recommendation is that the hardware operations are should be performed on the physical device which is like a server and collection of the installed code on the hard drive which are like Microsoft.

Attach: Network diagram – Design 1

ICT Network Architecture Design 2

Complete this section for ICT network architecture design 2. If they are completing this in theyr RTO, information about the network and work details will be as per the information discussed at the meeting with theyr assessor. If they are completing this for theyr own business, this will be as per the networks they are accessing.

Work details

Outline the details of the work as relevant to the networks to be designed. As a minimum this must include:

·           scope of the work to completed including overall objectives

·           the business’ specifications

·           timelines within which the work must be completed

·           budget allocated

·           procedures to be followed, including security arrangements

·           issues/problems/opportunities that the client has flagged

·           current and future traffic demands.

Here they created a website for the company because there are issues in the software of the company and many problems has been arisen due to the software and lack of best material here they have to update the software and it has the following objective like

The objective of making a website is to grow the growth of business and the organization and its profitability it objective is to create money, sell products via e-commerce websites, affiliate websites, intention to make sell services, and save money of the organization.

The hope is to shorten the project clearly, be approachable, and be fast to load and write the content.

The desired functionality is modest and they will clear and easy to appreciate to a participant, as the quality of the creation and description.

Business specifications mean it is the document which putting together to launch before launching the product to make advertising and do effective marketing planning (Van Elsutheyge, 2015).

This project must be completed within 8 months.

The total budget should be $3,785.

The procedure must be followed correctly like they have to first analyze the user activities, and produce the prototype design and then evaluate it then executable the prototype, and finally implement it there should be an effective process should be followed by the company the process should be done with follow all the legislation, standards and following all the important procedure are should be done they have to set the expectation of the document. Then they have to use the interface design. And the need and design and principle of the operating system. Which is based on business needs. And analyze them effectively.

Challenges faced by clients

Different expectations, contents which are stalled which are half progress, clients’ unreasonable demands, too much client communications, work overload, and price negotiating.

Current demand of the company to produce large and best quality Motivate employees and increases the production and profitability of the company.

Legislation, codes, regulations and standards

Provide an example of each that they must adhere to whilst completing their work managing network traffic. Explain how each example they provide applies to their work.

Legislation, standards, and procedures

There should be legislation once they are emerging the theybsite their requirement be a privacy policy. It is very important to have a privacy policy to gather special data from the worker, they require path the data protection rule. They need to follow with the California consumer privacy act

website standards are the technology that they use to shape websites. It standards occur in the mechanical long paper which is called report open standards I must be free with together practices and underwrite and not by the allowing rights (Mazzarella, 2015).

Site access

 

Draft an email that could be sent to a client to organise site access.

good morning

this email is written due to access the mail dear client they issue all the information about the new software and design please check it carefully and access the site and organize site access in an effective way.

Thank they

Proposed ICT network architecture design

Document their proposed network design using a network diagram tool.

Make sure they also document the hardware and software that will be needed.

Attach the diagram of their design diagram to their Portfolio.

In a technical condition, here is a want for a mobile approachable design, an SSL permit, storage memory, and communication borders, sends, theyb page loads, functionalities, and behaviors.

It supports to display of the unalike content for apiece time it is observed. The page can alter with the time of the daytime and the user can admission the webpage.

The graphic arrival matters a lot like the color of the website, its picture, fonts, and the space and the general visual presence of the website.

 

Network architecture design report

Provide a report on the following:

·           Impact of the network design on the business requirements

·           Forecasted traffic and how the network design will be able to cater for this

·           Performance parameters which will be used to assess the network and the likely performance based on the design. Performance parameters must reflect standard industry benchmark

·           Costs of hardware and software proposed

·           Overall recommendations for preferred solutions including hardware and software.

The network design which should recognize which customer needs and embody technical and business goals need for the availability, affordability, security, and manageability of the company (Brouer, et al.,2014).

Forecasted traffic is the best part of processing the design of the road facilities, which is starting from the investment and study feasibility to developing the document work.

 

There are many performance parameters that are used to assess the network there are some different common metric that is used to measure the traffic network performance which is including the packet loss indicators, bandwidth, jitter, and throughput.

The cost of hardware software is %5k.

The recommendation is that the hardware operations are should be performed on the physical device which is like a server and collection

of the installed code on the hard drive which are like Microsoft (Langley, et al., 2017)

 

Attach: Network diagram – Design 2

Section 2: Network design finalisation

ICT Network Architecture Design 1

Final design feedback

Outline the final feedback they received from their assessor and how they will incorporate this into their final design.

Provide their final design and attach it to their Portfolio.

According to the feedback from the assessor, they have received everything is perfectly fine and ok there is no need to alternate something everything is good and it is enough to achieve the desired goals.

 

Training and support

Outline the training and support requirements that will be needed to implement the new design.

There must be effective training and support should be given to the employees they need to access the training needs, then they have to set the objectives of training, and also create the action plan for it and implement the training initiatives and evaluate the training. Effective training and classes should be given to the employees and also motivate them from time to time in the process of operating a project this way they can increase their productivity and also help the company to achieve its target goals(Kasim, et al., 2016).
Hardware and software suppliers

Based on the hardware and software solutions they identified in Section 1 of their Portfolio, contact two possible suppliers. Contact can be completed through a review of the supplier’s website and identifying the specifications and costs for the equipment that will be required as part of the network they have designed.

Provide screenshots of the information they research.

Techno source Australia

Cottonness ptv ltd

Central innovation

 

Final design

Include a request for approval for their design here.

Good morning sir, this email is to inform they that they are working to grow the website for our business and they can previously plan everything like how to do what is the technique and about all what disclosure and what testing they can recognize or plot about each amount as required. Please provide me the feedback after inspecting all the belongings I hope they like them and if somewhat desire to be interchanged please provide the valuable feedback so that they twitch work on it as soon as possible.

Thank they have a nice day.

Attach: Final design 1
Screenshots for supplier information

ICT Network Architecture Design 2

Final design feedback

Outline the final feedback they received from their assessor and how they will incorporate this into their final design.

Provide their final design and attach it to their Portfolio.

 

 

According to the feedback from the assessor, they have received everything is perfectly fine and ok there is no need to alternate something everything is good and it is enough to achieve the desired goals.

 

Training and support

Outline the training and support requirements that will be needed to implement the new design.

There must be effective training and support should be given to the employees they need to access the training needs, then they have to set the objectives of training, and also create the action plan for it and implement the training initiatives and evaluate the training. Effective training and classes should be given to the employees and also motivate them from time to time in the process of operating a project this way they can increase their productivity and also help the company to achieve its target goals (Baykara, et al., 2016).
Hardware and software suppliers

Based on the hardware and software solutions they identified in Section 1 of their Portfolio, contact two possible suppliers. Contact can be completed through a review of the supplier’s website and identifying the specifications and costs for the equipment that will be required as part of the network they have designed.

Provide screenshots of the information they research.

Techno source Australia

Cottonness ptv ltd

Central innovation

 

Final design

Include a request for approval for their design here.

Good morning sir, this email is to inform they that they are working to grow the website for our business and they can previously plan everything like how to do what is the technique and about all what disclosure and what testing they can recognize or plot about each amount as required. Please provide me their feedback after inspecting all the belongings I hope they like them and if somewhat desire to be interchanged please provide their valuable feedback so that they twitch work on it as soon as possible.

Thank they have a nice day.

Attach: Final design 2
Screenshots for supplier information

References

Baykara, E., Ruf, C. A., Fioravanti, C., Käthner, I., Simon, N., Kleih, S. C., … & Halder, S. (2016). Effects of training and motivation on auditory P300 brain–computer interface performance. Clinical Neurophysiology127(1), 379-387.

Brouer, B. D., Alvarez, J. F., Plum, C. E., Pisinger, D., & Sigurd, M. M. (2014). A base integer programming model and benchmark suite for liner-shipping network design. Transportation Science48(2), 281-312.

Kasim, D., Rantetampang, A. L., & Lumbantobing, H. (2016). Relationships of Work Discipline, Leadership, Training, and Motivation to Performance of Employees Administration Abepura Hospital Papua 2015. Journal of Sciences: Basic and Applied Research26(1), 154-164.

Langley, A., Riddoch, A., Wilk, A., Vicente, A., Krasic, C., Zhang, D., … & Shi, Z. (2017, August). The quic transport protocol: Design and internet-scale deployment. In Proceedings of the conference of the ACM special interest group on data communication (pp. 183-196).

Mazzarella, L. (2015). Energy retrofit of historic and existing buildings. The legislative and regulatory point of view. Energy and Buildings95, 23-31.

Van Elsutheyge, P. (2015). Securing the institutional balance in the procedure for concluding international agreements: European Parliament v. Council (Pirate Transfer Agreement with Mauritius). Common Market Law Review52(5).

Leave a Reply

Your email address will not be published. Required fields are marked *