Skip to content

BSBMGT516 Facilitate continuous improvement

Student Declaration

To be filled out and submitted with assessment responses

◻   I declare that this task and any attached document related to the task is all my own work and I have not cheated or plagiarised the work or colluded with any other student(s)

◻   I understand that if I am found to have plagiarised, cheated or colluded, action will be taken against me according to the process explained to me

◻   I have correctly referenced all resources and reference texts throughout these assessment tasks.

◻   I have read and understood the assessment requirements for this unit

◻   I understand the rights to re-assessment

◻   I understand the right to appeal the decisions made in the assessment

Unit Title

Unit Code

Student name
Student ID number
Student signature Date
Task Number
——OFFICE USE ONLY—–

For Trainer and Assessor to complete:

◻   Student requested reasonable adjustment for the assessment

Marking Sheet

Completed successfully

Did the student satisfactorily:

Comments Y N DNS
The student has satisfactorily completed and submitted the following:

·         PowerPoint presentation in Task 2.1

·         Observation checklist in Task 2.1

·         Summary of the outcome of the session in Task 2.1.1

·         Plan-Do-Check-Act approach for one of the initiatives in Task 2.1.2

·         Updated CI register in Task 2.1.3

·         Email to Project Sponsor in Task 2.1.4

·         Strategies to ensure that team members are actively encouraged and supported to participate in decision-making processes, assume responsibility and exercise initiative as appropriate. In Task 2.2A

·         A system to ensure that the organisation’s continuous improvement processes are communicated to stakeholders. In Task 2.2B

·         A process to ensure that insights and experiences from business activities are captured and accessible through knowledge management systems. In Task 2.2C

·         Strategies to ensure that systems and processes are used to monitor operational progress and identify ways to improve planning and operations. In Task 2.2D

·         A process to ensure that project team members are informed of outcomes of continuous improvement efforts. In Task 2.2E

·         Social media post in Task 2.3A

·         Record of feedback from consultation with the Project Sponsor in Task 2.3B

 

 

 

The student attended the consultation meeting with the Project Sponsor in week 4:

·         Consulted on CI strategies, systems and processes

·         Gathered relevant  feedback and inputs

·         Engaged actively in the consultation

·         Adjusted strategy, systems and processes as per the outcome of the consultation

·         Applied a collaborative approach

·         Answered questions promptly

·         Listened actively

·         Presented information clearly

Feedback provided in comments.

 

 

Demonstrated ability to:

·         Identify current systems and processes that facilitate continuous improvement

·         Identify and define improvement needs and opportunities for the organisation

·         Develop decision-making processes to assist continuous improvement and communicate to relevant stakeholders

·         Develop new systems and processes that facilitate continuous improvement according to improvement needs and opportunities

·         Establish processes that confirm team members are informed about continuous improvement outcomes

·         Confirm relevant systems and processes meet organisation sustainability requirements

·         Confirm team progress, insights and experiences are captured and accessible using knowledge management systems

·         Coach individuals and teams to implement and support continuous improvement systems and processes

·         Identify and evaluate ways in which planning and operations could be improved

·         Make recommendations and communicate strategies to relevant stakeholders

·         Seek feedback from relevant stakeholders on systems and processes

This is evidenced by:

·         PowerPoint presentation in Task 2.1

·         Observation checklist in Task 2.1

·         Summary of the outcome of the session in Task 2.1.1

·         Plan-Do-Check-Act approach for one of the initiatives in Task 2.1.2

·         Updated CI register in Task 2.1.3

·         Email to Project Sponsor in Task 2.1.4

 

 

Demonstrated ability to:

·         Develop decision-making processes to assist continuous improvement and communicate to relevant stakeholders

·         Develop strategies for continuous improvement and encourage team members to participate in decision-making processes

·         Develop knowledge management systems to capture team progress, insights and experiences from business activities

·         Develop new systems and processes that facilitate continuous improvement according to improvement needs and opportunities

·         Establish processes that confirm team members are informed about continuous improvement outcomes

·         Confirm team progress, insights and experiences are captured and accessible using knowledge management systems

This is evidenced by:

·         Strategies to ensure that team members are actively encouraged and supported to participate in decision-making processes, assume responsibility and exercise initiative as appropriate. In Task 2.2A

·         A system to ensure that the organisation’s continuous improvement processes are communicated to stakeholders. In Task 2.2B

·         A process to ensure that insights and experiences from business activities are captured and accessible through knowledge management systems. In Task 2.2C

·         Strategies to ensure that systems and processes are used to monitor operational progress and identify ways to improve planning and operations. In Task 2.2D

·         A process to ensure that project team members are informed of outcomes of continuous improvement efforts. In Task 2.2E

 

 

Demonstrated ability to:

·         Establish processes that confirm team members are informed about continuous improvement outcomes

·         Make recommendations and communicate strategies to relevant stakeholders

·         Evaluate outcomes and identify opportunities for improvement

·         Seek feedback from relevant stakeholders on systems and processes

·         Identify other areas for improvement and document feedback for future planning

This is evidenced by:

·         Social media post in Task 2.3A

·         Record of feedback from consultation with the Project Sponsor in Task 2.3B

·         Participation in the consultation and feedback session with the project sponsor (refer to Marking Sheet)

 

 

When collaborating with the group, the student has actively participated in group work with a substantial contribution that can be assessed individually for all the requirements of this task.  

 

Task Outcome:                 Satisfactory  Not Yet Satisfactory
Student Name:
Assessor Name:

Assessor Signature:

Date:

Task 2 – Establish continuous improvement systems and processes

Task summary and instructions
What is this assessment task about? Refer to and read the documents saved in a separate folder:

·         MMI company profile and project task

·         Policies and Procedures

You have been recently engaged by XYZ Pty Ltd trading as MMI as a Project Manager (PM) to develop and implement a project to open a new campus in Sydney (refer to MMI strategic objectives).

·         The Board of Directors (BoD) has allocated 3 million dollars to the project.

·         Project duration: 1 year.

·         You can employ four new staff members to be part of the project team for its duration. Source the rest of the project team from existing MMI personnel (flexible work arrangements will be needed)

The project includes:

·         Finding premises in Sydney CBD ( 800-1000 square metres, onsite parking for staff, natural light)

Ideally, there will be enough room for 5-7 classes, one meeting room, one computer lab, 1 x student kitchen, student lounge, 1 x staff kitchen, three offices for staff, toilet facilities

·         Rent the premise

·         Obtain necessary permits

·         Source architect and building company

·         Source and buy furniture and equipment

·         Liaise with the architect and building company

The project steering committee is composed of:

·         Mr Eli Brown – Non-executive Director

·         Mr Leonard Black – CFO

·         Academic Manager (Jacob Graham)

The project sponsor is Taylor Varin (Client Service Manager), played by the trainer and assessor.

You will have to:

·         Determine the project requirements

·         Work in collaboration with pertinent stakeholders

·         Scope the project

·         Cost and resource the project

·         Develop the project plan

·         Execute the project

·         Finalise the project

Each unit covered in your Diploma of Project Management will address a part of the project:

·         Scope

·         Time

·         Quality

·         Cost

·         Human Resources

·         Information system and communication

·         Risk

·         Project Integration

·         Communicate with influence

·         Facilitate continuous improvement in project work

·         Develop project workplace policy and procedures for sustainability

·         Lead and manage project team effectiveness

BSBSTR502 addresses continuous improvement in project work.

Having a clear vision of the project and its structure will help you plan and implement it in simulated work conditions.

Your trainer and assessor will provide support and mentorship in the role of Project Sponsor (PS).

You will work in a project team of max four students. You will both lead the team and be a part of it to experience different project roles

in the simulated work environment, project manager being the main one.

Take turns playing the role of PM when the task requires project team collaboration. The trainer and assessor will observe project work and provide feedback on the Marking Sheet.

Form or join a project team (3-4 students in the team).

Document the name of the students in the table below:

Student Name
Student Name
Student Name
Student Name

You will collaborate with the project team in a simulated work environment to carry out the responsibility of your role as a PM relevant to continuous improvement.

Although you will lead and collaborate with the project team in some of the tasks as instructed, your assessment’s work must be individual, and it will be marked as such.

This task comprises of the following assessment methods:

o   Product-based

o   Direct observation of Role-Play

o   Case Study

o   Other (specify)

It has been designed to evaluate your ability to/competency in:

·         Identify current systems and processes that facilitate continuous improvement

·         Identify and define improvement needs and opportunities for the organisation

·         Develop decision-making processes to assist continuous improvement and communicate to relevant stakeholders

·         Develop strategies for continuous improvement and encourage team members to participate in decision-making processes

·         Develop knowledge management systems to capture team progress, insights and experiences from business activities

·         Develop new systems and processes that facilitate continuous improvement according to improvement needs and opportunities

·         Establish processes that confirm team members are informed about continuous improvement outcomes

·         Confirm relevant systems and processes meet organisation sustainability requirements

·         Confirm team progress, insights and experiences are captured and accessible using knowledge management systems

·         Coach individuals and teams to implement and support continuous improvement systems and processes

·         Identify and evaluate ways in which planning and operations could be improved

·         Make recommendations and communicate strategies to relevant stakeholders

·         Evaluate outcomes and identify opportunities for improvement

·         Seek feedback from relevant stakeholders on systems and processes

·         Identify other areas for improvement and document feedback for future planning

Your assessor will be looking for demonstrated evidence of your competency in the above.

You are required to address the following:

·         Task 2.1 CI initiatives and practices

o  Meet with the team, deliver a training session, brainstorm ideas for the CI initiatives and conduct a planning session with the team

·         Task 2.2 CI strategies, processes and systems

o  Develop CI strategies, processes and systems

·         Task 2.3 Communication

o  Announce one CI initiative to all MMI staff

o  Consultation with the Project Sponsor

Although the assessment requires group collaboration to simulate a work environment, the assessment submission is individual, and it will be marked as such.

What do I need to do to complete this task satisfactorily? ·         submit the completed assessment tasks, according to instructions,

·         complete the tasks with sufficient detail and present them in a professional manner,

·         use your own words and reference sources appropriately,

·         meet the word count where required,

·         use the scenario provided,

·         use the templates provided where required,

·         for your performance to be deemed satisfactory in this assessment task, you must satisfactorily address all of the assessment criteria,

·         if part of this task is not satisfactorily completed, you will be asked to complete further assessment to demonstrate satisfactory performance.

Specifications You must deliver/participate in:

·         Training, coaching and brainstorming session with the project team in week 3 (Role-Play)

·         Consultation and feedback session with the project sponsor in week 4 (Role-Play)

You must submit to GOALS

·         PowerPoint presentation

·         Observation checklist

·         Summary of the outcome of the session

·         Plan-Do-Check-Act approach for one of the initiatives

·         Updated CI register

·         Email to Project Sponsor

·         Strategies to ensure that team members are actively encouraged and supported to participate in decision-making processes, assume responsibility and exercise initiative as appropriate.

·         A system to ensure that the organisation’s continuous improvement processes are communicated to stakeholders.

·         A process to ensure that insights and experiences from business activities are captured and accessible through knowledge management systems.

·         Strategies to ensure that systems and processes are used to monitor operational progress and to identify ways in which planning and operations could be improved.

·         A process to ensure that project team members are informed of outcomes of continuous improvement efforts.

·         Social media post

·         Record of feedback from consultation with the Project Sponsor

Resources and equipment •         Computer with Internet access

•         Access to Microsoft Office suites or similar software

•         Learning material

•         Scenario for assessment as provided

•         Appendices as provided

•         Relevant policies and procedures as provided

•         Templates as provided

Re-submission opportunities You will be provided feedback on your performance by the Assessor. The feedback will indicate if you have satisfactorily addressed the requirements of each part of this task. If any parts of the task are not satisfactorily completed, the assessor will explain why, and provide you written feedback along with guidance on what you must undertake to demonstrate satisfactory performance. Re-assessment attempt(s) will be arranged at a later time and date. You have the right to appeal the outcome of assessment decisions if you feel that you have been dealt with unfairly or have other appropriate grounds for an appeal. You are encouraged to consult with the assessor prior to attempting this task if you do not understand any part of this task or if you have any learning issues or needs that may hinder you when attempting any part of the assessment.

Complete the following activities:

As a Project Manager, you have decided to improve sustainable workplace practices and would like to introduce the following initiatives in project work:

  • Encourage sustainable eating habits by minimising the use of disposable containers
  • Go paperless
  • Manage food waste at work using brown bin solutions
  • Implement energy savings policies
  • Encourage the use of sustainable transportation to work

To do so, you will:

  • Apply continuous improvement (CI) processes and systems
  • Encourage team members to participate in the decision-making process and commit to the improvements
  • Coach and mentor team members on CI
  • Ensure that insights and experience from the sustainability activities are captured and shared
  • Develop strategies, systems and processes to implement and sustain a continuous improvement culture

 Task 2.1 Ci initiatives and practices

Meet with the project team and use part of the meeting to deliver a coaching and mentoring session to ensure that the team understands what CI is and its value for a business. This will ensure that team members will implement and support the CI initiatives and participate in the decision-making process.

  • Review the learning material and undertake independent research. Prepare a training session for the team to cover:
  • Definition of continuous improvement
  • The benefits of implementing continuous improvement systems and processes in the workplace
  • Continuous improvement models that may be suitable for project work, such as the Plan Do Check Act, DMAIC or TQM approach to continuous improvement. Select two models for the training session.
  • Current CI policy at MMI and proposed improvements
  • Prepare to conduct a brainstorming activity on what actions could be taken to:
  • Encourage sustainable eating habits by minimising the use of disposable containers
  • Go paperless
  • Manage food waste at work using brown bin solutions
  • Implement energy savings policies
  • Encourage the use of sustainable transportation to work
  • Prepare to facilitate a collaborative planning session to plan the implementation of the brainstormed activities using a Plan Do Check Act approach.
  • Prepare to obtain commitment to the CI initiatives from the team and agree on responsibilities.

Schedule a time with the trainer and assessor in week 3 of class and conduct the meeting with the project team.

All team members will have to take turns to present, facilitate and train as Project Managers (instructions provided below).

The trainer and assessor will evaluate your performance during the training session.

If you are absent from class, you are responsible for making alternative arrangements with the trainer and assessor to perform the Role-Play.

Duration: 60-90 minutes

Before the training session

  • Prepare a PP presentation to cover all the required points. Submit the PP with your assessment.
  • Review the current CI policy and identify improvements
  • Prepare the coaching session
  • Prepare to facilitate the brainstorming and planning session

During the training session

  • Present:
  • Definition of continuous improvement
  • The benefits of implementing continuous improvement systems and processes in the workplace
  • Continuous improvement models that may be suitable for project work, such as the Plan Do Check Act, DMAIC or TQM approach to continuous improvement. Select two models for the training session.
  • Current CI policy at MMI and proposed improvements. Ask the team for feedback and inputs.

Note: each student must present to the rest of the project team as the Project Manager.

  • Lead a brainstorming session on what actions could be taken to implement the following CI initiatives:
  • Encourage sustainable eating habits by minimising the use of disposable containers
  • Go paperless
  • Implement energy savings policies
  • Encourage the use of sustainable transportation to work

Note: each student in the project team must lead one brainstorming session on one of the initiatives listed above. All initiatives must be covered, so split the topics among the group.

Additionally, during the brainstorming session, evaluate how each initiative would meet sustainability requirements.

  • Select three key actions/initiative in collaboration with the team.
  • Facilitate a collaborative planning session for the implementation of the CI initiatives using a Plan-Do-Check-Act approach.

Note: all team members must demonstrate the ability to facilitate a planning session, take the lead in turns.

Obtain commitment to the CI initiatives from the team and agree on responsibilities.

After the training session

  1. Summarise the outcome of the session in the table below.
CI initiative Key actions (Three/initiative) How organisational sustainability requirements are met
Encourage sustainable eating habits by minimising the use of disposable containers 1) Usage of biodegradable disposal plates at the workplace.

2) Avoid plastic utensils for eating purpose.

3) Avoid food wastage and disposal of leftover food items in a proper way.

The eating habits in an organisation matters a lot when it comes to the sustainability. Disposal of the leftover foods should be done in an eco friendly and sustainable way. Also biodegradable cutery should be used to promote eco friendly habits.
Go paperless 1) Digitalisation of office work.

2) Minimisation of the use of cash for transaction. Promote casahless transactions.

3) Use electronic equipments for record keeping work.

Paperless transactions should be encouraged in officework. The modern apps and equipments should be used for record keeping and documentation work.
Implement energy savings policies 1) Swich off the electrical appliances when not in use.

2) Use power saving appliances for saving electricity.

3) Install automatic motion sensitive gadgets to avoid unnecessary overuse.

The energy saving will improve the work efficiency of the organisational resources by saving a lot of power. This in turn will cut the extra cost and save energy in a sustainable system.
Encourage the use of sustainable transportation to work 1) Use ecofriendly transportations such as electric vehicles for transportation.

2) Sharing or pooling of the transportation facility for the employees to and from work.

3) Encourage employees to use eco friendly bikes or bycycles to and from office.

The ststainable transports like e-bikes and electrical vehicles will reduce the pollution level and will help in maintaining sustainable development aroung the work campus. Also employees can pool their transportation facilties to further cut the cost of travel to save time and fuel(Mĺkva, et al., 2016).

  1. Document the Plan-Do-Check-Act approach for one of the CI initiatives (your choice of initiative).
CI Initiative: <Add>
Plan

Recognise the opportunity and plan a change

Organise conference meet to receive sugession and feedbacks from clients and employees. After that forming a committee to decide on the actions to be taken for the continuous improvement of the organisation.
Do

Test the change.

After receiving various imputs from cients and employees, plan the to do steps to be taken for improving the work. It includes improving the collaborative skills of the employees through various activities for better team work.
Check

Review the test, analyse the results, and identify what you’ve learned.

The receiving various imputs from cients and employees gives an insight to the development work that has to be done for continuous development of the organisation. The brainstorming session conducted by the committee can be utilised to develop new plans and roadmaps for continuous development. For example, the improving of collaborative skills among the employees are crucial for the overall teamwork and productivity of the employees.
Act

Take action based on what you learned in the study step.

Indulge the employees in different types of collaborative activities to improve their interpersonal skills and teamwork spirit. This could be fun debate and discussions or various games or sports that promotes team sprit and brotherhood (Berwick, 2019).

  1. Update the Project CI register adding the improvements that were discussed during the training session:
  • CI initiatives to improve sustainability practices
  • Improvements to the CI Policy
Date Suggested Improvement CI Category Actions Timeline Responsibility Completed Y/N
2/07/2022 Biodegradable cutlery Sustainable development Include biodegradable cutlery 3 months Chef Y
3/07/2022 Interpersonal skills Personality development Improve interpersonal skills of employees 2 months Manager Y
4/07/2022 Collaborative skills Personality development Improve collaborative skills of employees 4 months Manager Y
5/07/2022 Eco friendly transportation Sustainable development Promoting eco friendly transportation 2 months Logistic head Y
6/07/2022 Go paperless Sustainable development Limit or prevent the use of paper for officework 3 months Manager Y
7/07/2022 Save energy Sustainable development Use motion sensitive and power saving equipment’s 4 months Electrical head N
8/07/2022 Digitalization Sustainable development Use digital equipments for record keeping and transactions. 2 months Manager (Butler, et al., 2018)

 

N

CI Categories: Industry Engagement Feedback; Audit Feedback; Complaint Feedback; Staff Feedback

  1. Write an email to the Project Sponsor.

The email must address the following:

  • Inform the Project Sponsor about the CI initiatives to improve sustainability practices in the project team. Suggest testing the practices in the project environment and then implement them across the organisation.
  • Inform the Project Sponsor of the proposed improvements to the existing CI policy.
  • Explain how change and improvement processes meet sustainability requirements.
  • Attach the CI Register to the email.

The text of the email should be in grammatically correct English, written in an appropriate (polite, business-like) style.

(100-150 words)

Template 1 -Email

Task 2.2 CI strategies, processes and systems

Develop CI strategies, processes and systems:

  1. Strategies to ensure that team members are actively encouraged and supported to participate in decision-making processes, assume responsibility and exercise initiative as appropriate.

Two strategies, 50-100 words.

  1. A system to ensure that the organisation’s continuous improvement processes are communicated to stakeholders.

Describe the communication channel, technology used and process. Include who the information needs to be communicated to and when. (50-100 words)

  1. A process to ensure that insights and experiences from business activities are captured and accessible through knowledge management systems.

Step by step process. Indicate who is responsible for each step.

  1. Strategies to ensure that systems and processes are used to monitor operational progress and to identify ways in which planning and operations could be improved.

Three strategies (30-50 words each), consider using project monitoring and controlling system.

  1. A process to ensure that project team members are informed of outcomes of continuous improvement efforts.

Step by step process. Indicate who is responsible for each step.

Document your work below:

A Build trust- it helps in decision making and encourage team member team leader generae healthy environment for team to build trust beween employee share work and share problems if have an issue then team leader solve all issue  and provide proper raining for better decision.

Suggestion box- suggestion box encourage the employee to submit idea and decision  is process of feedback one emloyee who does no represent yourself in meeting because he is shy use suggestion box  and help in decision making.

B Emails – email is basic communication channel which is use in organisation weshare information and message via mail

It is fast communication source and effective channel send information quickly.

Store email message is quickl and reduce paper work for this channel .

Phon calls – some organisation use phon for information send and  urgent information share on call. Some software application is also use for share information.

Social media is a communication channel tthatt currently use in maximum organisation for advertisement of product and services and  check eho review our website and deman of product b social media so i is one of the best communication channel.

C Knowledge management system is a technology and software that use in organisation for team it helps the tteam for gather information and management ,origanise and share information  by software and reduce employee work and gaher information b software.

It is process of collect data and attendance sheet and work sheet of employee is best source for collect data and   organise data.

Organise the  collected data and arrange systematically organisation data in this process.

Summerizing organision data  lengthy information in tabular form or graphical format and stored properly (Khan et al., 2019).

Experiences team member analyse the whole data and  after comleteng all data helps in decision making and knowledge management is important skill of organisation.

D Watch employees work properly they work according to expecttaionn or not  team leader ob served the work of employee.if employee create mistake  training provide to achieve task and review after training.

Invaste in right technologies means invest in software and application i pad and commpuer for make digital ha tool helps in fast work and easily achieve task.

E Project manger use presentation and meeting for training purpose and  improve in continuous plan and outcome is use brown dustbin for recycle waste material and renewable energy sourse isn use for save energy and install solar plant in organisation and day light is use plant the tree for healthy environment and digital tool is use in organisation for make paperless compuer laptop and ipad  for making report. Project manager is responsible for all work (Vogel, et al., 2016).

 Task 2.3 Communication

  1. Social media post

Prepare a social media post to announce one of the CI initiatives from the project team to improve sustainability practices in the workplace to all MMI staff.

Note: the post could be as simple as a text with a picture.

Record the post in the space provided below:

  1. Consultation

Schedule a brief consultation session (5-10 minutes) time with the trainer and assessor ( playing the role of the Project Sponsor in the simulated work environment) in week 4 of class, and discuss the CI strategies, processes and systems developed in Task 2.2.

Record the feedback from the Project Sponsor in the space provided below:

Trainer: Hello good morning.

Assessor: Good morning.

Trainer: We need to organise development activities for the employees for the continuous improvement strategies.

Assessor: Yes we need to arrange a training session regarding the sustainable use of various resources.

Trainer: Yes lets start with the energy resources that are renewable and eco friendly.

Assessor: Sure, Lets install motion sensitive and power saving appliances in the office premises to save power.

Trainer: After this we need to install a complaint box to take the feedback of all the employees and use the suggestion for continuous development strategies.

Assessor: Yes, We need to brief all the employees regarding this as soon as possible.

Trainer:This will give us an insight into the thoughts of the employees involved in this.

Assessor:Yes, this willimprove the overall work culture of the organisation(Galeazzo, et al., 2017).

Apply the feedback received to the CI strategies, processes and systems developed in Task 2.2 before submitting the assessment. The trainer and assessor will check that the feedback was applied when marking the assessment.

The trainer and assessor will evaluate your performance during the consultation session and provide feedback on the marking sheet.

If you are absent from class, you are responsible for making alternative arrangements with the trainer and assessor to attend the consultation session.

Appendix 1 – CI Policy

Continuous Improvement

Purpose

This policy provides details of XYZ Pty Ltd (XYZ) approach to continuous improvement.

The purpose of the policy is to provide principles to guide the continuous improvement practices of XYZ staff to:

  • encourage continuous improvement in the workplace
  • ensure that all XYZ activities, processes and systems support our focus on quality

This policy applies to all XYZ staff.

Policy and Procedures

Continuous improvement (CI) is at the core of the management strategy of XYZ, and it is recognised as a competitive factor in the marketplace.

CI covers all aspects of the operation of XYZ driving organisational excellence to improve value delivery to all XYZ stakeholders, including both clients and employees.

By implementing a culture of continuous improvement, the company will:

  • focus on understanding and satisfying the clients;
  • regularly review approaches and methods with improvement cycles and conclusions implemented;
  • benchmark and regularly measure the performance of key processes;
  • manage business using facts rather than opinion;
  • maintain a culture of clear, open communication;
  • work to reduce cycle-time in all aspects of the business;
  • promote active teamwork as a normal way of achieving outcomes;
  • recognise and promote improvement efforts;
  • develop a culture where continuous improvement involves everyone, and the process of change becomes routine; and
  • develops and values key partnerships with employees, clients and other stakeholders.

Several processes are used by XYZ to implement and maintain a system of continuous improvement:

  • Every area Manager is responsible for conducting a performance audit once/year and to present its findings to the CEO
  • Client and employees surveys are conducted regularly, and the results of the surveys are presented to the CEO to be discussed in the monthly management meeting
  • Complaints are an opportunity for constructive feedback to improve performance standards
  • The Marketing department is responsible for conducting external business environment analysis to monitor trends, technology and standards relevant to the industry
  • Attendance to conferences and networking events is encouraged to gather ideas for improvement
  • Professional development of staff on quality management practices is part of the management development plans
  • Quality Circle groups work cross-functionally in the organisation (with meetings scheduled each month)

The HR Manager is responsible for coordinating the CI program and its initiatives.

References

Mĺkva, M., Prajová, V., Yakimovich, B., Korshunov, A., & Tyurin, I. (2016). Standardization–one of the tools of continuous improvement. Procedia Engineering149, 329-332.

Berwick, D. M. (2019). Sounding board: Continuous improvement as an ideal in health care. In Management of Health Care (pp. 183-186). Routledge.

Butler, M., Szwejczewski, M., & Sweeney, M. (2018). A model of continuous improvement programme management. Production Planning & Control29(5), 386-402.

Khan, S. A., Kaviani, M. A., Galli, B. J., & Ishtiaq, P. (2019). Application of continuous improvement techniques to improve organization performance: A case study. International Journal of Lean Six Sigma.

Cohen-Vogel, L., Cannata, M., Rutledge, S. A., & Socol, A. R. (2016). A model of continuous improvement in high schools: A process for research, innovation design, implementation, and scale. Teachers College Record118(13), 1-26.

Galeazzo, A., Furlan, A., & Vinelli, A. (2017). The organizational infrastructure of continuous improvement–an empirical analysis. Operations Management Research10(1), 33-46.

Leave a Reply

Your email address will not be published. Required fields are marked *