Assessment 3

Introduction

Bartone highway improvement strategy helps to guide the development of the NSW road corridor for the development of the people. This is the project which is working currently in New Zealand. The main reason behind this improvement management strategy of the Barton Highway. The key benefit of this barton highway improvement strategy is to improve the efficiency of the roads. They also, increase the safety procedures of the organization. The main motive of the project development is to develop and construct the highway road and the bridge. They want to construct this bridge with all the safety and the maintenance of the security for the people. The Australian and NSW government joint their funds for the improvement of the Barton Highway. The motive of the development of this highway is to use it for transportation with the roads and the maritime. This project should be completed in a short period of the duration. They also, have to use the proper protection procedures on the highway. They are focusing on the improvement procedures of the safety procedures and the road safety.

Aims and benefits

The highway construction company aims to build the highway in the combined forms. This will provide the benefit of the tour site and makes the easy way for them to travel in the city. This also reduces traffic and pollution and makes things faster in society. Building this project is an important thing to do and for this, they have to follow the working policy and the procedures. During the construction of this project, the Australian government is using an intelligent transport system. This is the manufacture of the project and this will help the people to get the information and the related to the key and the location (Cozens, 2015).

They want to produce a better level of the services and this will help the people to understand the direction. Building the highway and helping the people will become the fastest route in transportation. This is the duty of the government to help the development and the infrastructure of the highways. This construction will help the country to build the economic procedures of the country. The aim and the benefits of this project development are to make sure to handle the infrastructure in the highway site.  Their motive and aim are to provide an extra level of safety and security to their local people in the city. They are also, focusing on expanding and improving the safety procedures of the people who are going to be using the highway. This is the main reason the government of Australia and New Zealand is spending their money on the fund and for the development of the NSW roads (Cozens, 2015).

Integration management

Integration management is the thing that is used in the construction of the highway with full of safety procedures. During the management of the project and with the help of integration management is to they will be able to handle all departments on the construction site. In the architectural design of the bridge and therefore, they have to make sure to handle the things. The project management integration has to divide into the different types of tasks and the resources and also, they have the various types of responsibilities (Cozens, & Van der Linde, 2015).

In this management procedure, they will start the work by completing the task step by step. In task 1 they have to purchase the raw materials and the types of equipment for buildings the highway and the roads. Therefore they will buy the materials and the resources for the company’s development. The materials that will use in the construction of the highway are the soil, sand, bricks, and cement also, the stones. These all are the types of equipment that are used in the manufacturing of the products and the highway construction (Cozens, & Van der Linde, 2015).

In the second task, they want to allocate their work to their supervisor according to their working policy. they also, divide their work based on the demand of the company and the workers working specialty. This will be the task that will be handled by the supervisor and the resources will take from the project management plan and the project management schedule and their report. This is all management should be done during the time of the construction. This will be the duty of the supervisor to handle this department to divide the work between the team members (Foster, et al., 2016).

The third task is about developing the design of the bridge. This will be done under the supervision of the engineer’s team and the architecture. They have to develop the design of the highway and in they have to take care of everything related to the environment. They have to make sure to protect the environment and after that, they will set up the roadside facilities. These are the facilities that will help the company to increase safety and provide safety measures to the people. The resources that are used in developing the design of the bridge with the help of the design documents. Highways have to be in the maintenance and developed under the supervision and with the help of the civil engineers for the safety of the people (Foster, et al., 2016).

Task 4 is the last step to starting the procedures of developing and constructing the Highway. The team management has to purchase the technologies and types of equipment also, as the machinery. These are the machinery that will work on the big level and this may cost high. Some technologies are used in manufacturing and constructing the highway. The camera, video graffing, maps, and design template. These are the various types of resources that are used in developing and manufacturing the highway. The responsibility for this is the purchase manager of the management and the construction team. This is their duty to make sure to handle things and develop a better and more secure plan for the construction of the Highway. These all are the details and the step that will be followed in the construction of the highway in the project management integration of the highway (Ghomi, et al., 2016).

Project management integration

These management steps include the four-step and the meaning of this step is to manage the construction of the highway. They want to the management of their project development. There are four tasks which they have to do in the management of the construction of the highway. In the first task, they will have to measure the roads and then based on the measurement they will calculate them. During the measurement, they have to use the measurement types of equipment to maintain the balance. The contractor and their team members are responsible for this department or the task management. Also, they will have to handle the measurement and the other things should be maintained because they have to provide the securities to the people (Ghomi, et al., 2016).

In the second task, they have to find out the best level of the contractor and the reason behind this is that. They have to build a better level of the highway and the reason is that it will be sued by the people at a large level. This has been very clear that there is an estimate that a total of 95% of people will be able to use this highway in a day. The resources which are conducted and collected from the resources are the details of the construction company. The internet, google, magazines also, newspapers. these are all sources that will help the management team of the highway construction to build a bridge in a better and more protective manner.  The marketing team manager and their teammates have to handle this department and make sure to finalize the deals with the construction contractors’ companies (Giles, 2016).

During the development and construction of the highway. They have to follow the task third in this task they have to check the quality. The quality of the materials during the construction of the highway is an important thing. The reason behind checking the quality is because this is the main source on which the highway building. The materials will describe the strong and the manufacturing level of the construction of the highway. They have to check the best level of the materials and based on this they have to make a list of the materials and then buy it (Jurewicz, et al., 2016).

The list contains all the materials and the rescue details that provide the warranty and the security for a long time in the building of the highway. This is the reason they have to make sure to do the quality standard is the rescues which are they have to do to handle the things. The quality manager and their team members also, the financial budget and their HOD will be responsible for the company’s development. This is the point they have to buy and finalize the materials based on their demand and the budget which is created by the Australian government and the NZ governed (Playford, et al., 2021).

S.no.  Task  Resources  Responsibilities 
1.  Measurement of roads to build the highway. Measurement equipment. Contractor team
2.  Find the best contractor to build the highway or roads. Detail related to the contractor companies. Marketing manager and team.
3.  Check the quality of work done by the project team. Quality standards Quality manager
4.  Purchase an intelligent transportation system to help the road user. Intelligent transportation system Purchase manager

In the fourth and the last task of this process, they want to purchase the electronics and their support. Also, the types of equipment for the rescues that help in the development of the highway. During the fourth task, they have to get the help of the intelligence and transmission system at this time. This will be used by the road user and provide safety to the people as they feel safe traveling on the highway at night time. This has been a common issue in the society in which most the people face some kinds of crimes and the risk during the traveling at the night time at the highway. This is the reason the security which is provided by them will help them to get and feel safer while traveling alone, and the long-distance (Jurewicz, et al., 2016).

These all are the four task which is followed and handled by the project management integration team. After that, they have to follow these procedures to get better and fine deliveries during the construction of the bridge on the highway (Playford, et al., 2021).

Change amendment plan

During the development of the strategies and manufacturing of the highway, they have to do changes in their management plan. The change is required in the management team plan. Based on these the government has to find out the best level of contractors for their company and handle the development. This is the main reason the government of Australia and New Zealand is spending their money on the fund and for the development of the NSW roads. Based on these they have to make sure to handle the things in the manufacturing of the highways. This is the reason they have to handle the materials that will describe the strong and the manufacturing level of the construction of the highway.

In the second step of the change management plan of the company during the building the construction of the highway. They have to deal with the contractors and the suppliers of the materials. This is the reason they have to contact the suppliers which have the best quality of the materials available at a reasonable price. This will provide benefit the highway team and the government of Australia and New Zealand.

The changes in the management plan for the construction of the highway have to maintain the contract between the suppliers of the materials and the best level of the technology holder. They have to make deals with the suppliers or the dealers that will provide affordable prices for developing the bridge and the highway.  This is the main reason they have to check the price of the materials and the types of equipment and also, the resources will become under the budget maintenance. The budget will be developed by the financial department of the construction highway team of the Australian government. The changes in the management describe the importance of the construction team and their engineers’ development. Engineers and the architecture have the duty to present the authority of the Australian government and New Zealand. There are various types of tasks and the preparation required for the company’s development. This has been very clear that most of the construction companies and the machinery manufacturers will come to the team of the construction for the contract.

During the process of contracting with the companies and the supporting partner for building the bridges they have to make sure to maintain the laws and the rules, also the regulations. This is for the safety of the people and the country’s government that are funding the development of the bridge. This is their duty to make sure to handle things and develop a better and more secure plan for the construction of the Highway. These all are the details and the step that will be followed in the construction of the highway in the project management integration of the highway. They have to make sure to handle things and observe the working process. The construction team and their team members have to make sure to follow the working procedures while the establishment of the highway (Szymanek, 2015).

The motive of the building this highway on such a large scale with the big team and their settlement security and also, under their supervision. This is the manufacture of the project and this will help the people to get the information and the related to the key and the location. This is the feature that helps them to relocate to the location when they get lost during their time of traveling. Also, this is the reason the security which is provided by them will help them to get and feel safer while traveling alone, and the long-distance (Szymanek, 2015).

The motive for using this equipment at the place like the traveling at the midnight. The use of these tools and the techniques to relocate the location for the people who get lost while traveling is because this will be used by the road user and provide safety to the people as they feel safe traveling on the highway at night time.

The government of Australia and New Zealand want to install the camera on the roadside. This will help the people and the society to maintain security in the society. Also, reduce the rate of crime in the cities and people will feel free to travel. Some data present the highway crimes in Australia and these are all the data that is present and happen at the road safety and their crashing period. The statics of the data and the crime comparison on the western Australian highway describe the crime rates on the highways. There is data that present and describe the road deaths by the cars and the other vehicles on the highways (Scott-Parker, 2017).

Calendar year Driver Passenger Pedestrian Motorcyclist Cyclist Australia
2008 670 303 189 245 28 1,437
2009 707 333 196 224 31 1,491
2010 636 284 170 224 38 1,353
Baseline1 671 307 185 231 32 1,427
2011 568 286 186 202 34 1,277
2012 610 260 170 223 33 1,300
2013 557 204 158 213 50 1,187
2014 533 228 151 191 45 1,151
2015 555 251 161 203 31 1,204
2016 622 208 182 249 29 1,292
2017 566 234 161 211 39 1,221
2018 522 204 177 191 35 1,135
2019 577 205 159 211 39 1,195
2020 534 189 138 188 41 1,095
12 months to Dec-20212 532 181 134 234 39 1,127
% change to baseline -20.7% -41.0% -27.6% 1.3% 21.9% -21.0%

 

These are the data that describe the road accident details and the other data which is also, lead to the accident procedures. This is the main motive of both the country’s government for raising the fund and development. Also, installing the cameras on the corner side of the roads will help the government to track the records. This is the step that will help them to get a better level of the services and the government will be able to find out the main reason behind such level of the cases that happen on the highway. According to the data of the 12 months of road accidents that describe the death of drivers is around 532 and the passenger death is 181 (Tao et al., 2022). This is the source that is presented by the Australian road deaths data based as of November 2021 (Tao et al., 2022).

Conclusion

The conclusion of the report which has been mentioned above is the details of the construction of the highway. This is the project which is working currently in New Zealand. The main reason behind this improvement management strategy of the Barton Highway. The key benefit of this barton highway improvement strategy is to improve the efficiency of the roads. Australian and New Zealand countries’ government wants to provide security the traveling at midnight on the highway. This will help the people and the society to maintain security in the society. Also, reduce the rate of crime in the cities and people will feel free to travel. Manufacture of the project and IT will help the people to get the information and the related to the key and the location. This is the feature that helps them to relocate to the location when they get lost during their time of traveling. Also, this is the reason the security which is provided by them will help them to get and feel safer while traveling alone, and for the long distance.

 

 

References

Cozens, P., & Love, T. (2015). A review and current status of crime prevention through environmental design (CPTED). Journal of Planning Literature30(4), 393-412.

Cozens, P., & Van der Linde, T. (2015). Perceptions of crime prevention through environmental design (CPTED) at Australian railway stations. Journal of Public Transportation18(4), 5.

Foster, S., Hooper, P., Knuiman, M., Christian, H., Bull, F., & Giles-Corti, B. (2016). Safe RESIDential Environments? A longitudinal analysis of the influence of crime-related safety on walking. International Journal of Behavioral Nutrition and Physical Activity13(1), 1-9.

Ghomi, H., Bagheri, M., Fu, L., & Miranda-Moreno, L. F. (2016). Analyzing injury severity factors at highway railway grade crossing accidents involving vulnerable road users: A comparative study. Traffic injury prevention17(8), 833-841.

Giles, M. (2016). Study in prison reduces recidivism and welfare dependence: A case study from Western Australia 2005-2010. Trends and issues in crime and criminal justice, (514), 1-9.

Jurewicz, C., Sobhani, A., Woolley, J., Dutschke, J., & Corben, B. (2016). Exploration of vehicle impact speed–injury severity relationships for application in safer road design. Transportation research procedia14, 4247-4256.

Playford, D., Strange, G., Celermajer, D. S., Evans, G., Scalia, G. M., Stewart, S., … & NEDA Investigators. (2021). Diastolic dysfunction and mortality in 436 360 men and women: the National Echo Database Australia (NEDA). European Heart Journal-Cardiovascular Imaging22(5), 505-515.

Scott-Parker, B., & Oviedo-Trespalacios, O. (2017). Young driver risky behaviour and predictors of crash risk in Australia, New Zealand and Colombia: Same but different?. Accident Analysis & Prevention99, 30-38.

Szymanek, A. (2015). Methodological aspects of risk management in road transport. Journal of KONBiN36(1), 51.

Tao, W., Agha Abbasi, M., Ali, M., AL Maliki, A. H., Zainol, R., AL Maliki, A. A., & Hussein, E. E. (2022). An Advanced Machine Learning Approach to Predicting Pedestrian Fatality Caused by Road Crashes: A Step toward Sustainable Pedestrian Safety. Sustainability14(4), 2436.

 

PRJ5105 Project Integration and Change Management

 

 

Table of Contents

Assessment 3. 3

Case project identification. 3

Integration management plan. 5

Change management plan. 11

Configuration management plan. 15

Conclusion. 16

References. 17

Assessment 3

Case project identification

This report is about improving the playground and barbeque area of Alexandria Park. They are planning to modify the barbeque area at the Park of Alexandria. They wanted to establish the design of the concept. In the next 10 years then wanted to modify as well as update more than the 60 parks over the area of Sydney, from the little pocket parks and gardens to huge local parks and gardens. They are interested in understanding who utilizes the recent parks, what works as well as what does not work. They also liked to listen to some ideas and views about the new parks and playgrounds. Alexandria Park is a very important location for the local Aboriginal and Torres Strait Islander communities. As the upgrade part then the city would also work with the knowledge holders of culture, the community members of Aboriginal and Torres Strait Islander, and local students of schools to establish the strategy of cultural design that would train how First Nations stories are celebrated in the garden or playground. In this project, the infrastructure and heavy construction project types had been selected. The risk that comes in this project is management (organizational and leadership) risk, technical risk, physical risk, and logistic risk. The requirements of the construction are an evaluation of the progress, performance of the schedule, actions for the contractor before real commencement, contracts management, and activities for the employer during the cycle of the project. For controlling the construction of this project some best practices are setting the scope clearly of the project, concentrating on the details, anticipating the setbacks of the project, the modification should be done according to the requirements, and communicating regularly (Plan, 2015).

 

Integration management plan

Project objectives

The objective of improving the playground and area of barbeque in Alexandria Park is to modify and upgrade the area. The Alexandria Park had been developed for the perfect sports as well as a picnic.

Scope

Their scope is that in the next 10 years they wanted to modify as well as update more than the 60 parks over the area of Sydney, from the little pocket parks and gardens to huge local parks and gardens.

Business case

This report is about improving the playground and barbeque area of Alexandria Park. They are planning to modify the barbeque area at the Park of Alexandria. They wanted to establish the design of the concept. In the next 10 years then wanted to modify as well as update more than the 60 parks over the area of Sydney, from the little pocket parks and gardens to huge local parks and gardens. They are interested in understanding who utilizes the recent parks, what works as well as what does not work. They also liked to listen to some ideas and views about the new parks and playgrounds. Alexandria Park is a very important location for the local Aboriginal and Torres Strait Islander communities. As the upgrade part then the city would also work with the knowledge holders of culture, the community members of Aboriginal and Torres Strait Islander, and local students of schools to establish the strategy of cultural design that would train how First Nations stories are celebrated in the garden or playground. In this project, the infrastructure and heavy construction project types had been selected.

Risk

The risks that are coming in this project are:

Management (organizational and leadership) risk: The management risk involves the wrong selection of the team of the project, there is inadequate communication infrastructure is a car, no document processors, project manual and processes, Unsatisfactory control, poor quality control, lack of experienced persons in the team of the project, and inability to take the time appropriate actions. If there are some failures to know some specific hazards then some steps in the risk management could not be executed for the risk. It is extremely suggested to consider the risk before starting this kind of construction project.

Technical risk: Technical risk includes anything that bounces from making the product that is needed by the customer. It could involve resources uncertainty, the uncertainty of materials availability, incomplete design, and inadequate investigation of the site. This risk could usually happen if there are variations in the scope as well as the requirement of the project and when there are errors in the designs.

Physical risk: Low-quality procurement or Inadequate resources, weather conditions like cold temperature, heavy rainfall, extremely hot, materials non-availability like quantity and quality, Unsecure working conditions, theft, wastage on fire, and many more.

Logistic risk: Logistic risk could be considered in some form from every market supply-chain view. This risk involves the transportation availability facilities and the construction equipment availability like construction machinery, labor, spare parts, and fuel. Without locating all these issues of the logistics that the risk could become big and it could also be loss in the project and the project could also be delayed (Municipality, 2012).

Constraints challenges

Cost overruns- Various projects of construction face miserably if it comes to meeting their starting estimates of the cost. On the worldwide range, the overheads of the average cost in the project of construction initiates at 16.5%. The individual project might exceed or extend their project by 175%. If the project is used then the rest could be higher the cost overruns. Project the scale and complexity word specifically define your capability to satisfy the requirements of the original cost. The problems that could come are:

  • Unrealistic measurements due to ignorance, deception, or naivety
  • Material amount escalation, external risk, and adverse conditions of the weather
  • Scope changes, demand of the client, and starting the design of the project.
  • Performance error and inadequate project management

Schedule overruns and unrealistic deadlines- This problem is usually in the project management of construction as the budget overruns and may stem from the reasons similar variety that involves poor management and unforeseen issues. The important ones or lack of preliminary analyses and forecasting. It could give result in unworkable deadlines as well as unrealistic expectations. When the limits of the project time hours are so tight and they were not in line or sequence by the work actual score then the manager is probably to face some other negative impacts or issues besides the overruns of the schedule. The unreasonable Deadlines course employee burnout, the morale of a low team, and excess stress. The influence of performance quality as well as productivity. Therefore To deliver the project on schedule as well as establish realistic deadlines than one had to revise your entire strategy of time management.

Inadequate risk management- It is already mentioned that the failure to control the risk leads to schedule and budget overruns. In the construction projects, the risk management is a huge challenge that deserves special outlining as the risks businesses face in this construction industry are more costly as well as diverse than in others-

  • Unknown conditions of this site
  • Economic crisis and issues
  • Security risk that outcomes in injuries and accidents
  • Issues by suppliers and subcontractors
  • Inclement weather and natural disasters
  • Problems with team coordination
  • Escalation in cost of materials
  • Shortages of workforce and turnover of the staff

There are some of the risks that the manager of construction should take into account before starting the real work. Otherwise, they had to suffer from the low-performance quality, stakeholder issues and conflicts, and constant delays that could also decrease the chance of a successful project. Therefore all the projects are unique, the security and number of factors that could threaten their completion depend to a huge exceed. To deal with issues well then you must be required to obtain an approach of methodological to the risk management (Sears et al., 2015).

Requirements

Get the right people or train your team- The industry of the construction could experience a lack of labor shortage. When you start the project then you must confirm that you have to take the right people. Also, give the correct people the correct responsibilities and jobs and confirm your crew or dream is clear by their expectations on the quality of construction. One should spend their time with the team to train them. It is because training is very important to effectiveness. For the supervisor, the training required principles of sound management and techniques to maintain the project running easily and smoothly. If supervisors assist their team members to master the critical skills then one would see the advantage in productivity in terms of their project.

Invest in technology- Now for successful construction projects technology is very important and one could also say it is the key to construction. For many organizations and industries, construction investment in technology will seem intimidating or even impossible. The reason for this is the convincing fear their workforce to get concerned regarding it being hard to obtain these technologies. But the technologies do not have to be finished with their innovative products for your processes of work. Investing in the correct technology said is the chance to set you apart from the other organizations.

Understand the specification of the project- Some of the persons start by laying down the plan of the project and it is very important to know about the plan of the project. The contractor is required to fully understand the specification as well as the standards that had been set by the team and the customer. All the standards and the specification must reflect the finished outcomes of the project that had been made (Harris et al., 2021).

Discuss with the team- It is very clear to give the ideas of the towers to your team and how things will be scheduled and what had been expected should be clear to the team members. A very good suggestion is a project kick-off meeting to do the discussions.

Tools and techniques

  • Concrete mixer
  • Brick hammer
  • Bolster
  • Chisel
  • Circular saw
  • Digging bar
  • End frames
  • Ladder
  • Measuring tape
  • Line and pins
  • Plumb rule
  • Rammer
  • Safety glasses
  • Excavators
  • Bulldozers
  • Wheel tractor
  • Pile driving machine

Lesson learned discussion

It had been concluded from the integrated management plan that the objective is to improve the playground and area of the barbeque of Alexandria Park. It had been established for the perfect picnic as well as sports. The toilets were also constructed in the park. It will be designed according to the plan and requirements. The plan and scope are to modify 60 parks in the area of Sydney city in the next 10 years. The risks that are coming up in this project are Management risk, physical risk, technical risk, and logistical risk. The constant challenges that are coming in this project are Cost overruns, schedule overruns and unrealistic deadlines, and inadequate risk management. The requirements for this project are to invest in the technology, discussed by the team members, get the correct people or train your crew or team,  and Understand the specification of the project. As the upgrade part then the city would also work with the knowledge holders of culture, the community members of Aboriginal and Torres Strait Islander, and local students of schools to establish the strategy of cultural design that would train how First Nations stories are celebrated in the garden or playground. In this project, the infrastructure and heavy construction project types had been selected. The risk that comes in this project is management (organizational and leadership) risk, technical risk, physical risk, and logistic risk. The requirements of the construction are the evaluation of the progress, performance of the schedule, actions for the contractor before real commencement, contracts management, and activities for the employer during the cycle of the project. For controlling the construction of this project some best practices are setting the scope clearly of the project, concentrating on the details, anticipating the setbacks of the project, the modification should be done according to the requirements, and communicating regularly.

 

 

Change management plan

Reason for the change

The change management plan had been developed for improving the playground and barbeque area of Alexandria Park. In this plan, they need to develop the design of the concept. In the next 10 years, they also needed to update as well as modify more than 60 parks in the region of the city of Sydney. The change management plan had been established as they wanted to give many other facilities to the people. They also wanted to know some views and suggestions from the other team members regarding the playgrounds and parks. The change had been considered because they want to design a new map and a new design for the same area. Alexandria Park is a very important location for the local Aboriginal and Torres Strait Islander communities. As the upgrade part then the city would also work with the knowledge holders of culture, the community members of Aboriginal and Torres Strait Islander, and local students of schools to establish the strategy of cultural design that would train how First Nations stories are celebrated in the garden or playground (Birss et al., 2016).

Phase Stakeholder Change type Impacts Actions
Design Engineering or design consultant There are the changes in the codes and regulations that are the reason the change is done on the project site and redevelopment is occur. The impact will be that the design rework will be done. Better design control, and extreme buildability in the design.
Construction Subcontractors or the contractors The defect of quality can come while taking the materials. Orders of change, design change, and rework of site. Quality control

Coordinated drawings and documents

Daily and regular logs

Specifications User, owner, client, or architect Changes to needs like project scope, brief of design, and specification of the project. Changes in the construction process and design. Give detailed specification document before bidding

Benefits from the change

The change management plan had been established for improving the playgrounds barbeque area at Alexandria Park because they wanted to assess as well as understand the requirement and the change impact. They want to design another map for the parks and playgrounds. They also want to do changes in the regulations and codes that are done at the site of the project. The rework of the site should be done according to the requirements and schedule. The stakeholders that are involved in this are our design consultant, sub-contractor, user, client, architect, and contractors. Through the change management plan, they could align the resources inside the business to support the change. The change management plan also manages the diverse change cost. It could also decrease the time required to execute the change. The change management plan will be done according to the staff and helps the staff members to understand the process of the change. After the change, Alexandria Park will look very well and perfectly designed. Therefore the change is needed in this project.

Milestones

S. No. Milestones
1 Understand how to select the location of the park.
2 Understand the community and market
3 Engage the community during the process of planning
4 Factors in the architecture and landscaping
5 Give options for the multiple activities of the park
6 Select accurate equipment for a playground for the park
7 Start the construction
8 Construct toilets and other facilities
9 Finishing

Change management communication plan

S. No. Stakeholder Power/interest Issues Communication vehicle Frequency
1 Contractor, labor Medium Poor productivity Email Weekly
2 Labour, site engineer, project manager, contractor Medium Work is not done according to schedule (Downs, 2016). Face to face meetings Monthly
3 Project manager, human resource manager Low Skilled labor shortage Email Weekly
4 Contractor Low Material cost increasing Email and face to face meetings Monthly
5 Site engineer, contractor, project manager High Poor project performance Email and face to face meetings Weekly

 

 

Configuration management plan

Project overview

It is about improving the playground and barbeque area of Alexandria Park. They are planning to modify the barbeque area at the Park of Alexandria. They wanted to establish the design of the concept. In the next 10 years then wanted to modify as well as update more than the 60 parks over the area of Sydney, from the little pocket parks and gardens to huge local parks and gardens. They are interested in understanding who utilizes the recent parks, what works as well as what does not work (Walker, 2015). They also liked to listen to some ideas and views about the new parks and playgrounds. Alexandria Park is a very important location for the local Aboriginal and Torres Strait Islander communities.

Requirements of configuration

The traceability of the Playgrounds of the barbeque area at Alexandria Park Is required. It has been concluded that proper identification, as well as system elements documentation, interdependence, and interfaces, had been identified. In the project, thorough and timely disposition and vetting of change requests had been done. The documentation and control of the approved changes to baseline had also been done.

Tracking configuration

The project scope had been done appropriately according to the schedule. The scope of the project is to improve the playground and area Barbeque of Alexandria Park. It will be also helpful for maintaining the records of changes.

Documenting changes

The Improving of the Barbeque area of Alexandria park is going on according to the requirements, schedule, and budget. It is confirmed that the outcomes of the project meet all the requirements (Wilcock & Knights, 2017).

 

 

Conclusion

It had been concluded from the report that redevelopment had been done for improving the playground and barbeque area of Alexandria Park. The construction or redevelopment is going on with step by step process. They wanted to develop 60 parks in the next 10 years. They also collected many views and suggestions regarding developing new parks and playgrounds. This place is so important for local Aboriginal and Torres Strait Islander communities. In this project, the infrastructure and heavy construction project types had been selected. The risk that comes in this project is management (organizational and leadership) risk, technical risk, physical risk, and logistic risk. The requirements of the construction are an evaluation of the progress, performance of the schedule, actions for the contractor before real commencement, contracts management, and activities for the employer during the cycle of the project. For controlling the construction of this project some best practices are setting the scope clearly of the project, concentrating on the details, anticipating the setbacks of the project, the modification should be done according to the requirements, and communicating regularly.

 

 

References

Birss, C., Cowell, C., Hayward, N., Peinke, D., Hrabar, H.H. and Kotze, A., 2016. Biodiversity Management Plan for the Cape mountain zebra in South Africa. Jointly developed by CapeNature, South African National Parks, Eastern Cape Parks and Tourism Agency, National Zoological Gardens, Department of Environmental Affairs, Northern Cape Department of Environment and Nature Conservation, Eastern Cape Department of Economic Development. Environmental Affairs and Tourism and Free State Department of Economic, Small business, Tourism, and Environmental Affairs. Version1. https://www.dffe.gov.za/sites/default/files/gazetted_notices/nemba_biodiversitymanagementplan_bmp_capemountainzebra41498_gon214_0.pdf

Downs, L.J., 2016. Time management training. Association for Talent Development. https://books.google.com/books?hl=en&lr=&id=ZtQtDQAAQBAJ&oi=fnd&pg=PT16&dq=integration+management+plan+in+construction+of+alexandaria+park+&ots=sFS8d_VLHG&sig=auusCKppTzWUqp8lfti_7J6LNeg

Harris, F., McCaffer, R., Baldwin, A. and Edum-Fotwe, F., 2021. Modern construction management. John Wiley & Sons. https://books.google.com/books?hl=en&lr=&id=oTUGEAAAQBAJ&oi=fnd&pg=PR11&dq=integration+management+plan+in+construction&ots=-4urvjAMJj&sig=z8vpJZuJCmUezn-G0NBMEhdc6-4

Municipality, N.L., 2012. Integrated development plan 2012-2017. Ceres: Witzenberg Municipality. http://www.swartland.org.za/media/docs/2012/IDP/Draft%20IDP%2029%20March%202012.pdf

Plan, A., 2015. List of Attachments for Public Hearing No. 2 Community Development Block Grant Funding Allocations for FY 2015-16 & One-Year Action Plan. City. http://www.ci.milpitas.ca.gov/_pdfs/council/2015/042115/item_02.pdf

Sears, S.K., Sears, G.A., Clough, R.H., Rounds, J.L. and Segner, R.O., 2015. Construction project management. John Wiley & Sons. https://books.google.com/books?hl=en&lr=&id=Q__9BQAAQBAJ&oi=fnd&pg=PR7&dq=Project+Management+in+construction+&ots=Yo4qnvWSue&sig=w3SH2vspfwO2e0bhzPLFCrKA5hs

Walker, A., 2015. Project management in construction. John Wiley & Sons. https://books.google.com/books?hl=en&lr=&id=tT5EBgAAQBAJ&oi=fnd&pg=PP8&dq=Project+Management+in+construction+&ots=WsFFe1lfq4&sig=ANxOe5saqXVu13CQsZs692nKfjk

Wilcock, G. and Knights, P., 2017. Applying Configuration Management to Manage the Design and Operation of Critical Mining Systems. https://espace.library.uq.edu.au/view/UQ:705877/full_paper.pdf?dsi_version=312e4a8ff2d48e33dcacfc7ab5ee253a